Ghania Syakira, . (2026) PENGEMBANGAN MODUL PROJECT MANAGEMENT BERBASIS ENTERPRISE RESOURCE PLANNING (ERP) PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
|
Text
ABSTRAK.pdf Download (13kB) |
|
|
Text
AWAL.pdf Download (1MB) |
|
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (246kB) |
|
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (505kB) |
|
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (348kB) |
|
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (10MB) |
|
|
Text
BAB 5.pdf Download (236kB) |
|
|
Text
DAFTAR PUSTAKA.pdf Download (229kB) |
|
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository staff only Download (111kB) |
|
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (3MB) |
|
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (30MB) |
|
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (828kB) |
Abstract
PT XYZ, an energy sector company, faced data fragmentation issues within its internal project management systems, leading to inefficiencies caused by double data entry and a lack of cross-departmental integration. This research aims to design and develop a Minimum Viable Product (MVP) for a Project Management module using the Odoo ERP platform to address these issues. The methodology employed is a hybrid Water-Scrum-Fall approach, combining the structured planning of Enterprise Systems with the flexibility of Agile development. The research stages include field studies, current system analysis, configuration, customization of Odoo modules, and functional testing. The results indicate that the developed system successfully integrates the initiation, planning, execution, and closing phases of a project into a single digital ecosystem. Based on User Acceptance Testing (UAT) results, the system achieved a 96.4% functional pass rate and a user acceptance index of 86.67% (Very Good). The implementation is proven to increase operational efficiency through automatic data synchronization between project activities and accounting records.
| Item Type: | Thesis (Skripsi) |
|---|---|
| Additional Information: | [No.Panggil: 2210512150] [Pembimbing 1: I Wayan WIdi Pradnyana] [Pembimbing 2: M. Bayu Wibisono] [Penguji 1: Andhika Octa Indarso] [Penguji 2: Sarika] |
| Uncontrolled Keywords: | ERP, Odoo, Project Management, Water-Scrum-Fall, Operational Efficiency |
| Subjects: | T Technology > T Technology (General) |
| Divisions: | Fakultas Ilmu Komputer > Program Studi Sistem Informasi (S1) |
| Depositing User: | GHANIA SYAKIRA |
| Date Deposited: | 03 Sep 2026 03:31 |
| Last Modified: | 03 Sep 2026 03:31 |
| URI: | http://repository.upnvj.ac.id/id/eprint/51426 |
Actions (login required)
![]() |
View Item |
