ANALISIS TATA LETAK FASILITAS UNTUK MENGURANGI JARAK PERPINDAHAN MATERIAL PADA AREA PEMELIHARAAN BULANAN LOKOMOTIF DI DEPO CIPINANG PT KAI

Citra Amelia Azzahra, . (2025) ANALISIS TATA LETAK FASILITAS UNTUK MENGURANGI JARAK PERPINDAHAN MATERIAL PADA AREA PEMELIHARAAN BULANAN LOKOMOTIF DI DEPO CIPINANG PT KAI. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

This is the latest version of this item.

[img] Text
ABSTRAK.pdf

Download (247kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (365kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (326kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (263kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (301kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository staff only

Download (468kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (993kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (26MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (905kB)

Abstract

This research aims to analyze and design alternative facility layouts in the monthly locomotive maintenance area at the Cipinang Depot of PT KAI (Persero) to reduce the high material handling distances caused by the existing layout, which does not adequately support the required workflow. This study employs a descriptive quantitative approach using the Systematic Layout Planning (SLP) method. Data were collected through direct observation, interviews with management, and documentation of maintenance activities (primary data), and were supported by depot operational records (secondary data). The analysis stages include the preparation of input data, From-To Chart, Activity Relationship Chart, Activity Relationship Diagram, space requirement calculations, Space Relationship Diagram (SRD), Modifying Considerations and Practical Limitations, the development of alternative layouts, and evaluation. Through the rearrangement of areas such as the spare parts room, periodic maintenance area, repair area, and workshop to place them closer according to the sequence and relationship of activities, the flow of material movement becomes shorter and the distance between processes is reduced compared to the previous condition. The results show that the total material handling distance in the existing layout, which was 160.25 meters, can be reduced to 121.8 meters after implementing the proposed layout. Thus, the proposed layout contributes to a reduction of 38.45 meters, or approximately 23.98%, from the material handling distance of the existing layout.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil: 2210111116] [Pembimbing: Heni Nastiti] [Penguji 1: Rosali Sembiring Colia] [Ketua Penguji: Jenji Gunaedi Argo]
Uncontrolled Keywords: Facility Layout, Systematic Layout Planning (SLP), Material Handling Distance, Locomotive Maintenance.
Subjects: H Social Sciences > HC Economic History and Conditions
H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HE Transportation and Communications
Divisions: Fakultas Ekonomi dan Bisnis > Program Studi Manajemen (S1)
Depositing User: CITRA AMELIA AZZAHRA
Date Deposited: 26 Mar 2026 07:35
Last Modified: 26 Mar 2026 07:35
URI: http://repository.upnvj.ac.id/id/eprint/41605

Available Versions of this Item

  • ANALISIS TATA LETAK FASILITAS UNTUK MENGURANGI JARAK PERPINDAHAN MATERIAL PADA AREA PEMELIHARAAN BULANAN LOKOMOTIF DI DEPO CIPINANG PT KAI. (deposited 26 Mar 2026 07:35) [Currently Displayed]

Actions (login required)

View Item View Item