PENGENDALIAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN METODE CONTINUOUS REVIEW SYSTEM PADA PROSES STITCHING DI PT XYZ

Syfa Nazra, . (2025) PENGENDALIAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN METODE CONTINUOUS REVIEW SYSTEM PADA PROSES STITCHING DI PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (250kB)
[img] Text
AWAL.pdf

Download (2MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (403kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (437kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (566kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (271kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (269kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (140kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (13MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

PT XYZ is a manufacturing company providing carton box packaging that requires stitch wire as a raw material in its production process. However, the company often experiences obstacles in meeting customer demand due to the lack of stitch wire raw materials in the stitching process. The lack of stitch wire causes the production process to stop, which has an impact on delays in the delivery schedule. In addition, the company also has difficulty in predicting stitch wire needs accurately. In order to answer the existing problems, this study aims to predict stitch wire needs using the linear regression, ARIMA, and ARIMAX methods. In addition, it also aims to determine the minimum inventory level, reorder time, and optimal order quantity using the Continuous Review System method. Based on the research results, the ARIMAX method was selected as the best method for predicting stitch wire requirements in the next period of 38.35 kg. Meanwhile, the calculation results show that the minimum inventory needed is 0.605 kg, with a reorder time when the remaining inventory in the warehouse is 35.81 kg, and an order quantity of 246,78 kg.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 2110312004] [Pembimbing: Yulizar Widiatama] [Penguji 1: Nanang Alamsyah] [Penguji 2; Nur Fajriah]
Uncontrolled Keywords: Continuous Review System, Inventory Control, Forecasting
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: SYFA NAZRA
Date Deposited: 07 Aug 2025 02:58
Last Modified: 07 Aug 2025 02:58
URI: http://repository.upnvj.ac.id/id/eprint/39254

Actions (login required)

View Item View Item