PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI PEMBOROSAN (WASTE) DALAM LINI ASSEMBLY DI PT. XYZ

Muhammad Rafi Noviandra Setiyarso, . (2023) PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI PEMBOROSAN (WASTE) DALAM LINI ASSEMBLY DI PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (74kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (139kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (643kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (305kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
BAB 5.pdf

Download (84kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (152kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (94kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (21MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (687kB)

Abstract

PT. XYX is a company that operates in the manufacturing sector, especially car seats. In the production process at the assembly unit, the output produced is still below the target, the company wants to reduce waste that occurs in the assembly process, this will be done with a Lean Manufacturing approach and the help of analysis tools such as Value Stream Analysis Tools, Value Stream Mapping, Process Activity Mapping, Failure Mode Effect Analysis, and 5 Why's Analysis. After that, make a simulation with ProModel software. Based on the research results, it can be seen that the proposed improvements that have been submitted can reduce assembly time at PT. XYZ was 160.03 seconds or 2,667 minutes from the previous 666.42 seconds to 506,388 seconds and increased production output by 21%.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910312091] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Muhamad As'adi] [Penguji 2: Yulizar Widyatama]
Uncontrolled Keywords: Lean Manufacture, Waste, Value Stream Analysis Tools, Value Stream Mapping, Process Activity Mapping, Failure Mode Effect Analysis, dan 5 Why’s Analysis, ProModel.
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Muhammad Rafi Noviandra Setiyarso
Date Deposited: 19 Jan 2024 09:00
Last Modified: 16 Feb 2024 04:11
URI: http://repository.upnvj.ac.id/id/eprint/28282

Actions (login required)

View Item View Item