ANALISIS HUMAN RELIABILITY ASSESSMENT (HRA) PADA PEKERJAAN PENGOPERASIAN TOWER CRANE DI PROYEK KONSTRUKSI PT X MENGGUNAKAN METODE HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) TAHUN 2023

Siti Kholilah Nur Hamidah, . (2023) ANALISIS HUMAN RELIABILITY ASSESSMENT (HRA) PADA PEKERJAAN PENGOPERASIAN TOWER CRANE DI PROYEK KONSTRUKSI PT X MENGGUNAKAN METODE HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) TAHUN 2023. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (4MB)
[img] Text
AWAL.pdf

Download (4MB)
[img] Text
BAB 1.pdf

Download (4MB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
BAB 5.pdf

Download (4MB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (4MB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (10MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (248kB)

Abstract

Tower cranes are commonly used in construction projects. Tower crane accidents have significant impacts not only on workers at the construction site but also on people outside the construction area. This construction company has experienced a fatal accident related to a tower crane, resulting in the death of a worker who was struck by a concrete bucket that detached from the crane's hook. The incident was indicated to be caused by human error. The objective of this research is to assess human reliability in tower crane operations at Project Construction PT X using Human Error Assessment and Reduction Technique (HEART) method. This type of research is qualitative research. Based on the conducted research, the task with the lowest human reliability score was when the rigger provided instructions during the operation, scoring 0.37, indicating a possibility of inadequate communication. Recommendations to enhance worker reliability include ensuring that informants have sufficient rest and consistently use Personal Protective Equipment (PPE). Additionally, PT X should recruit specialized riggers who hold Occupational Health and Safety (OHS) licenses and competency certificates in their field, improve the shifting system for crane operators, install cooling systems in crane cabins, and conduct stricter supervision on every work activity. Keywords : Human Error, HEART Method, Tower Crane

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910713012] [Pembimbing: Dyah Utari] [Penguji 1: Afif Amir Amrullah] [Penguji 2: Cahya Arbitera]
Uncontrolled Keywords: Human Error, HEART Method, Tower Crane
Subjects: R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine
T Technology > TH Building construction
Divisions: Fakultas Ilmu Kesehatan > Program Studi Kesehatan Masyarakat (S1)
Depositing User: Siti Kholilah Nur Hamidah
Date Deposited: 18 Aug 2023 02:32
Last Modified: 18 Aug 2023 02:32
URI: http://repository.upnvj.ac.id/id/eprint/26419

Actions (login required)

View Item View Item