Muhammad Asyrof Faruq Qushoyyi, . (2023) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROSES BUNKERING KAPAL MENGGUNAKAN METODE HIRADC DAN FTA. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (34kB) |
|
Text
AWAL.pdf Download (1MB) |
|
Text
BAB 1.pdf Download (93kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (274kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (45kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (361kB) |
|
Text
BAB 5.pdf Download (18kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (125kB) |
|
Text
DAFTAR RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (22kB) |
|
Text
LAMPIRAN.pdf Download (512kB) |
|
Text
HASIL PLAGIARISME .pdf Restricted to Repository staff only Download (144kB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (475kB) |
Abstract
PT. KBS is a company that operates as a port service. The work problem at PT. KBS, work accidents occur in the construction sector which can cause physical damage to the workers' body parts and reduce labor productivity. To reduce the causes of work accidents in the Ship Bunkering section, an evaluation is carried out in identifying hazards and dealing with the causes of work accidents. Identification of the potential (source) of this hazard is done by recording all the steps for each activity that occurs in the Ship Bunkering Division at PT. KBS uses a risk management stage approach or Hazard Identification, Risk Assessment, Determining Control (HIRADC) so that a total of 20 risk events are obtained. Potential hazards that have the highest Risk Priority Index (RPI) category have 3 risk events, then 17 high risk events to find the cause of risk events with Fault Tree Analysis. Recommendations according to potential hazards are to design a prototype overload warning system, use personal protective equipment (PPE), supervise the implementation of work activities, train and carry out routine inspections. So that the results obtained from the causes of work accidents are expected to reduce the level of work accidents that exist from previous accidents by using the HIRADC and FTA methods.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [1810312041] [Pembimbing: Muhamad As'adi] [Penguji 1: Nurfajriah] [Penguji 2: Santika Sari] |
Uncontrolled Keywords: | Keywords; K3, HIRADC, FTA, Work Accidents, Ship Bunkering |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Muhammad Asyrof Faruq Qushoyyi |
Date Deposited: | 31 Jul 2023 08:25 |
Last Modified: | 31 Jul 2023 08:25 |
URI: | http://repository.upnvj.ac.id/id/eprint/26104 |
Actions (login required)
View Item |