OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ

Jeremia Radja Moza Malingkas, . (2023) OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (52kB)
[img] Text
AWAL.pdf

Download (406kB)
[img] Text
BAB 1.pdf

Download (87kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (277kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (86kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (801kB)
[img] Text
BAB 5.pdf

Download (143kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (130kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (17kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (598kB)
[img] Text
ARTIKEL.pdf
Restricted to Repository staff only

Download (738kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (12MB)

Abstract

In planning a construction project, it is very important to know the optimized time and costs. From the optimal time and cost, the project implementer can get the maximum profit. However, in the implementation of a project, the timeline is often not in accordance with the implementation at the project location, which can cause an increase in the duration of implementation and an increase in the project implementation budget, resulting in delayed project completion. In this discussion, the case study chosen by the researcher as the object of his research for the analysis of project time acceleration is the Bakauheuni port capacity building project by PT. XYZ. The construction process is planned to take 126 days. However, in reality PT. XYZ experienced a delay of 2 weeks due to delays in the arrival of construction equipment and also external factors. The purpose of this research is to effectively accelerate project completion time in terms of cost and analyze the effectiveness of shortened time using the CPM, PERT and Crashing overtime approaches. So that it can be seen that the acceleration of the duration of the project is the most effective and efficient and the budget does not exceed the budget of this project. The results of this study are 33 critical path work activities so that the optimal acceleration duration for the port dock capacity increase project is 18 days with 108 days remaining work time and an optimal cost of IDR 11,271,963,814

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312019] [Pembimbing 1 : Muhamad As’adi] [Pembimbing 2 : Nanang Alamsyah] [Penguji 1: M. Rachman Waluyo] [Penguji 2: Nurfajriah]
Uncontrolled Keywords: Project, Optimization, CPM, PERT, Crashing
Subjects: Q Science > Q Science (General)
Q Science > QA Mathematics
Q Science > QC Physics
T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Jeremia Radja Moza
Date Deposited: 08 Mar 2023 08:44
Last Modified: 08 Mar 2023 08:44
URI: http://repository.upnvj.ac.id/id/eprint/23780

Actions (login required)

View Item View Item