OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ

Tika Syahdillah Daratu, . (2022) OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (10kB)
[img] Text
AWAL.pdf

Download (490kB)
[img] Text
BAB 1.pdf

Download (111kB)
[img] Text
BAB 2.pdf

Download (692kB)
[img] Text
BAB 3.pdf

Download (202kB)
[img] Text
BAB 4.pdf

Download (681kB)
[img] Text
BAB 5.pdf

Download (90kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (90kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (77kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (3MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (7MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (350kB)

Abstract

In a development, it is very necessary to plan and schedule in detail about; activities, time and cost required to complete a project. This is done to get optimal results, optimistic time, and efficient costs. In this study, the case study used for the analysis of project time acceleration is the project to increase the capacity of the port of Merak port. This project took 121 days. However, in reality it cannot be denied that in the construction of a project there are several problems that are often faced, one of which is delays. The purpose of this research is to speed up the project completion time efficiently in terms of cost and analyze the effectiveness of the shortened time using the CPM and PERT methods and the Time Cost Trade Off. So that it can be known the minimum acceleration and the minimum cost. The results of this study are 30 critical path activities so that the optimal acceleration duration of the port dock capacity increase project is 24 days from the remaining 49 days of work with an optimal cost of Rp. 14,848,787,998.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 1810312031] [Pembimbing : M. Rachman Waluyo] [Penguji 1 : Muhammad As'adi] [Penguji 2 : Santika Sari]
Uncontrolled Keywords: Project, Optimization, CPM, PERT, Time Cost Trade Off
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Tika Syahdillah Daratu
Date Deposited: 21 Sep 2022 00:35
Last Modified: 21 Sep 2022 00:35
URI: http://repository.upnvj.ac.id/id/eprint/21258

Actions (login required)

View Item View Item