OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI

Wendi Juliansyah, . (2022) OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (170kB)
[img] Text
AWAL.pdf

Download (798kB)
[img] Text
BAB 1.pdf

Download (879kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (956kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (582kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
BAB 5.pdf

Download (434kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (655kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (55kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (10MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (516kB)

Abstract

Project planning requires supporting aspects so that errors do not occur such as increasing completion time. Delays occur from the influence of weather and workers' needs are not met. This research uses a container field project that takes 147 days. This project has a project time delay of 12 days so that acceleration is needed, the purpose of this research is to identify critical activities, calculate the probability of project success, and determine the optimal time and cost. The research methods are CPM, PERT, and Crashing. The CPM method knows 26 critical activities, then the PERT method knows a 95.35% chance of project success, crashing the addition of 1 hour of overtime work cuts 14 days at a cost of Rp. 7,520,647,067.57, the addition of 2 hours of overtime work cuts 24 days at a cost of Rp. 7,535,950,438.35. The optimal alternative is the addition of 1 hour of overtime work with a cost slope of Rp. Rp. 355,256.82. The application of the CPM, PERT, and crashing methods costs Rp. 7,520,647,067.57 and a penalty if 12 days of extra time costs Rp. 7,554,362,977.69 with a cost difference of Rp. 33,715,910,12.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312004] [Pembimbing: Muhamad As'adi] [Penguji 1: Yulizar Widiatama] [Penguji 2: Mohammad Rachman Waluyo]
Uncontrolled Keywords: CPM, PERT, Crashing, Delay, Project
Subjects: T Technology > T Technology (General)
T Technology > TH Building construction
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: WENDI JULIANSYAH
Date Deposited: 28 Jul 2022 05:40
Last Modified: 28 Jul 2022 05:40
URI: http://repository.upnvj.ac.id/id/eprint/19009