PENERAPAN METODE SINGLE MINUTE EXCHANGE OF DIE (SMED) UNTUK MENURUNKAN WAKTU SETUP MESIN DI PT.XYZ

Dwie Achmad Basyar, . (2022) PENERAPAN METODE SINGLE MINUTE EXCHANGE OF DIE (SMED) UNTUK MENURUNKAN WAKTU SETUP MESIN DI PT.XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (64kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (141kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (496kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (230kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (66kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (137kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (135kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (17MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (380kB)

Abstract

PT. XYZ is a market player in the pharmaceutical industry, particularly pharmaceuticals in the manufacturing of solid, semi-solid, and repacking products. This industry competes to create competitive products that can meet market needs. Based on direct field observations and interviews in 2021, there are problems with the setup time difference between a series of solid manufacturing machines so the outputs result are not optimal. The purpose of this research is to analyze the activities carried out on machine setup activities, as well as to reduce setup time using the Single Minute Exchange of Die (SMED) method to obtain optimal output results in the solid process. The research was supported by the Pareto Diagram, Process Flow Map, Time Study, SMED, Fishbone Diagram, and simulation using Arena Simulation Software. The results obtained in this study indicate that the standard time difference for the tableting machine setup is 34.9 minutes or 2097 seconds with a percentage reduction value of 18.7%. Meanwhile, for the primary packing line 3 machine, the standard setup time difference is 33.1 minutes or 1985 seconds with a percentage reduction of 21.4%. The actual production value is an average of 1267 large boxes/month to 1508 large boxes/month based on the proposed simulation difference, the difference is obtained by 241 large boxes/month and an average increase of 19.02% per month.

Item Type: Thesis (Skripsi)
Additional Information: [No Panggil: 1810312035] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Halim Mahfud} [Penguji 2: Yulizar Widiatama]
Uncontrolled Keywords: Single Minute Exchange Of Die (SMED), Time Study, Waste, Lean Manufacturing, Simulation.
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Dwie Achmad Basyar
Date Deposited: 26 Jul 2022 05:37
Last Modified: 26 Jul 2022 05:37
URI: http://repository.upnvj.ac.id/id/eprint/18794

Actions (login required)

View Item View Item