PERANCANGAN ULANG TATA LETAK DAN FASILITAS DI PT. XY DENGAN ALGORITMA COMPUTERIZED RELATIVE ALLOCATION OF FACILITIES TECHNIQUE (CRAFT)

Arya Gilang Rosmarwanto, . (2022) PERANCANGAN ULANG TATA LETAK DAN FASILITAS DI PT. XY DENGAN ALGORITMA COMPUTERIZED RELATIVE ALLOCATION OF FACILITIES TECHNIQUE (CRAFT). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (73kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (58kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (392kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (29kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (354kB)
[img] Text
BAB 5.pdf

Download (8kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (135kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (82kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (8MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (408kB)

Abstract

PT. XY is a meatballs-based company with various types of meatballs. This company uses a make to order (MTO) system to fulfill orders and used jobshop as their production flow. In terms of layout, PT. XY has a number of problems related to distance, namely the location of the raw material warehouse which is far from each other from the production room. Therefore, to solve this problem, the CRAFT algorithm is used as a solution for optimizing the layout at PT. XY. In this research, the CRAFT algorithm was run by two different software: WinQSB 2.0 and Microsoft Excel with Facility Layout Add-Ins. As a result, WinQSB 2.0 propose a layout with the result of material handling’s moment is equal to 6,534.79 m/day or shortening the overall distance by 5% and the mass of material handling by 29,397 kg or lightening the load by 13% of the actual layout. Meanwhile, the results of improvements through Microsoft Excel Facility Layout Add-Ins gave the moment and mass of material handling by 6,773.57 m/day and 31,417 kg, which each of them was 1% and 7% more efficient than the actual layout. Then, each of actual layout’s results has a moment and mass of material handling by 6,856.48 m/day and 33,881 kg. From these results, the solution given by WinQSB 2.0 became the best layout suggestion for PT. XY.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312002] [Pembimbing: Donny Montreano] [Penguji 1: Halim Mahfud] [Penguji 2: Yulizar Widiatama]
Uncontrolled Keywords: Facility Layout, Material Handling, CRAFT, WinQSB 2.0, Microsoft Excel Facility Layout Add-Ins.
Subjects: H Social Sciences > HD Industries. Land use. Labor
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Arya Gilang Rosmarwanto
Date Deposited: 12 Aug 2022 06:55
Last Modified: 12 Aug 2022 06:55
URI: http://repository.upnvj.ac.id/id/eprint/18573

Actions (login required)

View Item View Item