Adrian Diko Ananto, . (2022) ANALISIS KETERLAMBATAN PERAWATAN SHAFT PROPELLER DENGAN METODE FTA DAN FMEA. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (9kB) |
|
Text
AWAL.pdf Download (804kB) |
|
Text
BAB 1.pdf Download (18kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (352kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (47kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 5.pdf Download (14kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (76kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (83kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (13MB) |
|
Text
ARTIKEL KI.pdf Download (497kB) |
Abstract
In this study, the case of delay in maintenance of the KMP Portlink III Ro-Ro Ship shaft was raised. In this case where shaft maintenance can be done within 2-4 days but in the field it can take up to 10 days. In this case, the cause of the problem and proposed improvements to the problems that occurred at PT. this XYZ. Data processing is carried out with Fault Tree Analysis (FTA) to analyze the process and make system improvements to see possible delays that occur. FTA is an analysis using a graphical model to show a visual analysis of the process, then the cut set method is used to find the combination of events that occur. Labor shortage factor with a failure rate of 0.833. The biggest map timing result is turning which is done for 10 days. Based on FTA, the factors causing delays that have the highest probability of delays are the lack of operators in the workshop and mechanics of PT. XYZ with the probability value of this obstacle is 0.081. Proposed improvements can be made to 5S based on the results of the FMEA (Failure Mode And Effect Analysis) analysis of operator shortages with the resulting RPN number with a value of 900.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil:1810313044] [Pembimbing: Amir Marasabessy] [Penguji 1: Mohamad Rusdy Hatuwe] [Penguji 2: Bambang Sudjasta] |
Uncontrolled Keywords: | Shaft Maintenance, FTA, RPN. |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures V Naval Science > V Naval Science (General) V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
Divisions: | Fakultas Teknik > Program Studi Teknik Perkapalan (S1) |
Depositing User: | Adrian Diko Ananto |
Date Deposited: | 22 Jul 2022 08:29 |
Last Modified: | 27 Jul 2022 08:49 |
URI: | http://repository.upnvj.ac.id/id/eprint/18568 |
Actions (login required)
View Item |