ANALISIS PEMBOROSAN PADA PROSES PRODUKSI COIL WIRE ROD SECTION 5,5 DENGAN PENDEKATAN LEAN MANUFACTURING DAN SIMULASI DI PT TMS

Aini Naqisy Muslich, . (2021) ANALISIS PEMBOROSAN PADA PROSES PRODUKSI COIL WIRE ROD SECTION 5,5 DENGAN PENDEKATAN LEAN MANUFACTURING DAN SIMULASI DI PT TMS. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (29kB)
[img] Text
AWAL.pdf

Download (271kB)
[img] Text
BAB 1.pdf

Download (96kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (515kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (114kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (90kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (107kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (60kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (816kB)

Abstract

PT TMS is one of the manufacturing companies, especially steel production with one of the products produced is Wire Rod. Low wire steel or wire rod is a type of rolled steel produced from billets that have a round cross section. In this study includes the production process of coil wire rod section 5.5 which belongs to the category of products that are the highest demand. This product has high demand, but several products have not complied with the standards that have been determined because of waste in the production process. The purpose of this research is to provide proposed improvements to reduce waste that occurs during the production process as well as provide a better production system design based on the results of implementation through simulations using ProModel Software. The method used starts from Questionnaire 7 Waste, Value Stream Analysis Tools, Big Picture Mapping, Fishbone Chart, Failure Mode Effect Analysis and then continued with simulation using ProModel Software. The results showed that provided proposed improvements can reduce lead time from 23268.183 seconds or 387.80 minutes to 21084.791 seconds or 351.41 minutes. In addition, it can increase productivity with an increase in production output up to 15%.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil: 1710312036] [Pembimbing: . Siti Rohana Nasution ] [Penguji 1: Muhammad As’Adi] [Penguji 2: Alina Cynthia Dewi]
Uncontrolled Keywords: Lean Manufacturing, VALSAT, BPM, Fishbone Chart, FMEA, Simulation
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Aini Naqisy Muslich
Date Deposited: 22 Sep 2021 04:17
Last Modified: 22 Sep 2021 04:17
URI: http://repository.upnvj.ac.id/id/eprint/12512

Actions (login required)

View Item View Item