ANALISA TALI TAMBAT (MOORING) KAPAL PIPE LAY “XXXX” PADA SAAT PEMASANGAN KABEL BAWAH LAUT UNTUK PEMBANGKIT LISTRIK TENAGA ANGIN

Fikri Janitra Adiyatma, . (2021) ANALISA TALI TAMBAT (MOORING) KAPAL PIPE LAY “XXXX” PADA SAAT PEMASANGAN KABEL BAWAH LAUT UNTUK PEMBANGKIT LISTRIK TENAGA ANGIN. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (99kB)
[img] Text
AWAL (1).pdf

Download (756kB)
[img] Text
BAB 1.pdf

Download (211kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (424kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (352kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (191kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (190kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (144kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (274kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (862kB)

Abstract

Wind power plants at sea have been widely used in various countries, therefore Indonesia also needs to utilize renewable energy so that it does not cause emissions and is more environmentally friendly. One of them is an offshore wind power plant. PLB ships are used to install the structures and cables needed to distribute electricity ashore. This research is focused on the installation of submarine cables, especially the analysis of moorings for pipe lay barge vessels. The design of the mooring rope configuration must have the ability to hold the underlying structure or submarine cables and pipe lay barge vessels in position. In this analysis using 8 mooring ropes to withstand the effects of extreme wave loads, the analysis is carried out using Orcaflex and Moses software which aims to determine the reaction of moorings during submarine cable installation. Determination of the placement of the mooring point coordinates is very important, so it must pay attention to the distance from the ship to each anchor point by varying the length of the mooring rope and variations in the direction of the waves, besides that in this study an analysis was carried out if the mooring rope broke, the tension on the mooring rope would evaluated according to API RP 2SK and OCIMF. When the mooring rope length is 1000m, the highest tension value is 526.04 kN (53.67 MT) at wave direction 0 mooring rope s3, while when the mooring rope is 600m and the mooring rope tension is 697.31kN (71.15MT), and This value exceeds the standard determined by API RP 2SK which is 55.68 MT or 60% of MBL (minimum breaking load) of 92.8 MT. In the broken mooring rope, the highest tension value in the s3 mooring rope is 870.86 kN (88.86 MT) and this value is not recommended because it exceeds the standard.

Item Type: Thesis (Skripsi)
Additional Information: [ No Panghgil 1710313033] ]Pembimbing 1: Noverdo Saputra] ]Pembimbing 2: Purwo Joko Suranto] [Penguji : Wiwin Sulistyawa]
Uncontrolled Keywords: PLB (Pipe lay barge) ship, Mooring rope, Tension
Subjects: V Naval Science > V Naval Science (General)
Divisions: Fakultas Teknik > Program Studi Teknik Perkapalan (S1)
Depositing User: Fikri Janitra Adiyatma
Date Deposited: 17 Sep 2021 03:14
Last Modified: 17 Sep 2021 03:14
URI: http://repository.upnvj.ac.id/id/eprint/11449

Actions (login required)

View Item View Item